An Evaluation of Cost Control Measures Applied to Selected Small and Medium Sized Construction Firms.

The research determined suitable and effective cost control measures to forestall overrun of contracts by using available resources in Nigerian small/medium sized construction firms. The research data were derived from a survey of seven completed projects and nine selected on-going projects. The qu...

Πλήρης περιγραφή

Αποθηκεύτηκε σε:
Λεπτομέρειες βιβλιογραφικής εγγραφής
Κύριος συγγραφέας: Ademoroti, Gbadebo
Άλλοι συγγραφείς: Kyere, D. K.
Μορφή: Thesis
Γλώσσα:Αγγλικά
Έκδοση: Obafemi Awolowo University 2014
Θέματα:
Διαθέσιμο Online:http://localhost:8080/xmlui/handle/123456789/2306
Ετικέτες: Προσθήκη ετικέτας
Δεν υπάρχουν, Καταχωρήστε ετικέτα πρώτοι!
_version_ 1810764569528762368
author Ademoroti, Gbadebo
author2 Kyere, D. K.
author_facet Kyere, D. K.
Ademoroti, Gbadebo
author_sort Ademoroti, Gbadebo
collection DSpace
description The research determined suitable and effective cost control measures to forestall overrun of contracts by using available resources in Nigerian small/medium sized construction firms. The research data were derived from a survey of seven completed projects and nine selected on-going projects. The questionnaires were divided into four parts. The fit directed to client/financier/ consultants of completed projects determined whether the projects were overrun in terms of time, cost and quality. The second directed to Head office determined cost control measures. The third to supervisors discovered material wastage on site while the fourth to site workforce collected data on labour stability. An observational technique was used to collect additional information about wastage of building materials on the site. An in-depth analysis was carried out on weather data collected from meteorological services. The analysis of the data showed that projects overran either in terms of cost or time. The main cause of cost overrun was attributed to inflation in cost of building materials and time overrun was due to delay in stage payment by the client and bad weather. Based on a model of different sizes of construction firms derived from literature review, observation revealed that small and medium sized construction firms could manage projects up to N250,000.00 and N2,000,000.00 respectively. Emanating from this study, it is recommended that there should be pre-contract arrangement whereby all materiel needed for the project are purchased and kept in a store. The manufacturing of locally produced building materials should be intensified. The contractor should make use of meteorological service reports for the purpose of estimating, planning and control of construction projects. An establishment of an insurance policy bound should be encouraged to protect the contractor from client's failure to honour certificate of payment.
format Thesis
id oai:ir.oauife.edu.ng:123456789-2306
institution My University
language English
publishDate 2014
publisher Obafemi Awolowo University
record_format dspace
spelling oai:ir.oauife.edu.ng:123456789-23062023-05-13T11:07:38Z An Evaluation of Cost Control Measures Applied to Selected Small and Medium Sized Construction Firms. Ademoroti, Gbadebo Kyere, D. K. Cost control measures construction firms The research determined suitable and effective cost control measures to forestall overrun of contracts by using available resources in Nigerian small/medium sized construction firms. The research data were derived from a survey of seven completed projects and nine selected on-going projects. The questionnaires were divided into four parts. The fit directed to client/financier/ consultants of completed projects determined whether the projects were overrun in terms of time, cost and quality. The second directed to Head office determined cost control measures. The third to supervisors discovered material wastage on site while the fourth to site workforce collected data on labour stability. An observational technique was used to collect additional information about wastage of building materials on the site. An in-depth analysis was carried out on weather data collected from meteorological services. The analysis of the data showed that projects overran either in terms of cost or time. The main cause of cost overrun was attributed to inflation in cost of building materials and time overrun was due to delay in stage payment by the client and bad weather. Based on a model of different sizes of construction firms derived from literature review, observation revealed that small and medium sized construction firms could manage projects up to N250,000.00 and N2,000,000.00 respectively. Emanating from this study, it is recommended that there should be pre-contract arrangement whereby all materiel needed for the project are purchased and kept in a store. The manufacturing of locally produced building materials should be intensified. The contractor should make use of meteorological service reports for the purpose of estimating, planning and control of construction projects. An establishment of an insurance policy bound should be encouraged to protect the contractor from client's failure to honour certificate of payment. 2014-02-12T10:48:50Z 2018-10-27T13:36:57Z 2014-02-12T10:48:50Z 2018-10-27T13:36:57Z 1986 Thesis APA http://localhost:8080/xmlui/handle/123456789/2306 en PDF application/pdf Obafemi Awolowo University
spellingShingle Cost control measures
construction firms
Ademoroti, Gbadebo
An Evaluation of Cost Control Measures Applied to Selected Small and Medium Sized Construction Firms.
title An Evaluation of Cost Control Measures Applied to Selected Small and Medium Sized Construction Firms.
title_full An Evaluation of Cost Control Measures Applied to Selected Small and Medium Sized Construction Firms.
title_fullStr An Evaluation of Cost Control Measures Applied to Selected Small and Medium Sized Construction Firms.
title_full_unstemmed An Evaluation of Cost Control Measures Applied to Selected Small and Medium Sized Construction Firms.
title_short An Evaluation of Cost Control Measures Applied to Selected Small and Medium Sized Construction Firms.
title_sort evaluation of cost control measures applied to selected small and medium sized construction firms
topic Cost control measures
construction firms
url http://localhost:8080/xmlui/handle/123456789/2306
work_keys_str_mv AT ademorotigbadebo anevaluationofcostcontrolmeasuresappliedtoselectedsmallandmediumsizedconstructionfirms
AT ademorotigbadebo evaluationofcostcontrolmeasuresappliedtoselectedsmallandmediumsizedconstructionfirms