A Study of Plant and Equipment Utilization on Selected Construction Sites in Lagos State

The study examined the level of utilization of plant and equipment and its impacts on site operations in Lagos State with a view to optimising output levels on construction sites. One hundred and twenty (120) construction companies were selected from a population of two hundred and eighty five (2...

Descripción completa

Guardado en:
Detalles Bibliográficos
Autor principal: Akinola, Joseph Aderemi
Formato: Tesis
Lenguaje:inglés
Publicado: 2015
Materias:
Acceso en línea:http://localhost:8080/xmlui/handle/123456789/2308
Etiquetas: Agregar Etiqueta
Sin Etiquetas, Sea el primero en etiquetar este registro!
Descripción
Sumario:The study examined the level of utilization of plant and equipment and its impacts on site operations in Lagos State with a view to optimising output levels on construction sites. One hundred and twenty (120) construction companies were selected from a population of two hundred and eighty five (285) construction companies that were registered with Federation of Construction Industry (FOCI) in Lagos state. Primary data were obtained on plant and equipment acquisition methods, selection factors, extent of mechanization of site operations and effect of plant and equipment on performance with the use of questionnaire. The results revealed that construction companies acquired plant and equipment through hiring (64%) and leasing (17%) respectively. Using the Relative Importance Index, the selection criteria were identified to be technicality involved (RII = 4.20; N = 6), output required (RII = 4.10; N = 6), complexity of job (RII = 4.00; N = 6), site characteristics (RII = 3.60; N = 6), job accessibility (RII = 3.40; N = 6), and cost of procurement (RII 2.80; N = 6). The frequency of plant and equipment usage was significantly related to the level of output achieved. (x2= 7.990; P < 0.05). The utilization of plant and equipment significantly affected output rate on each of the selected operations; namely: excavation operation (t = 14.717; P < 0.05); soil stabilization operation (t = 4.027; P < 0.05); concrete batching operation (t = 3.883, P < 0.05), and asphalting operation (t = 4.116; P < 0.05) respectively. The study concluded that the level of utilization of plant and equipment by construction companies were below average, however the use of plant and equipment led to higher output levels except where low scale of operations such as site clearance was considered.