A Study of Plant and Equipment Utilization on Selected Construction Sites in Lagos State

The study examined the level of utilization of plant and equipment and its impacts on site operations in Lagos State with a view to optimising output levels on construction sites. One hundred and twenty (120) construction companies were selected from a population of two hundred and eighty five (2...

全面介紹

Saved in:
書目詳細資料
主要作者: Akinola, Joseph Aderemi
格式: Thesis
語言:英语
出版: 2015
主題:
在線閱讀:http://localhost:8080/xmlui/handle/123456789/2308
標簽: 添加標簽
沒有標簽, 成為第一個標記此記錄!
實物特徵
總結:The study examined the level of utilization of plant and equipment and its impacts on site operations in Lagos State with a view to optimising output levels on construction sites. One hundred and twenty (120) construction companies were selected from a population of two hundred and eighty five (285) construction companies that were registered with Federation of Construction Industry (FOCI) in Lagos state. Primary data were obtained on plant and equipment acquisition methods, selection factors, extent of mechanization of site operations and effect of plant and equipment on performance with the use of questionnaire. The results revealed that construction companies acquired plant and equipment through hiring (64%) and leasing (17%) respectively. Using the Relative Importance Index, the selection criteria were identified to be technicality involved (RII = 4.20; N = 6), output required (RII = 4.10; N = 6), complexity of job (RII = 4.00; N = 6), site characteristics (RII = 3.60; N = 6), job accessibility (RII = 3.40; N = 6), and cost of procurement (RII 2.80; N = 6). The frequency of plant and equipment usage was significantly related to the level of output achieved. (x2= 7.990; P < 0.05). The utilization of plant and equipment significantly affected output rate on each of the selected operations; namely: excavation operation (t = 14.717; P < 0.05); soil stabilization operation (t = 4.027; P < 0.05); concrete batching operation (t = 3.883, P < 0.05), and asphalting operation (t = 4.116; P < 0.05) respectively. The study concluded that the level of utilization of plant and equipment by construction companies were below average, however the use of plant and equipment led to higher output levels except where low scale of operations such as site clearance was considered.